Workover Automation
Posted on
2021-02-27
The Bright Automation team proposed the
"Integrated Solution for Pipe and Rod Transport and Storage" in 2020,
in order to solve the heavy physical labor and environmental pollution problems
caused by the transportation of pipe and rod in underground operations. It
covers an area of 39.4ft x 9.9ft to achieve the automatic transportation,
storage, measurement and oil pollution collection of the sucker rods, so as to
reduce operating costs and realize a green well site.
In the future, we are going to apply the
conceptions of "intelligent, safe and clean", "remote monitoring
and visualization of well sites" into product rapid iteration. The project
is on R&D now.